Leave Method Sequence
Employee level assignment takes priority over any other assignment in the sequence. This does not need to be part the sequence set up as this is a default.
Make sure the sequence is set to Yes and put in the order you would like to check before applying a method. It will always check the employee level assignment first and then look at the sequence set up.Â
NOTE: If reporting period is changed for a user, a new method will need to be created.Â
Missing timesheet - This includes timesheets not opened (created) and or timesheets with ZERO hours.
2024 DATABASICS, Inc